LHC RF Meetings
2010 Meetings
2009 Meetings
LHC
RF 14th January 09 |
LHC status + planning,
Tuner repairs, Faraday cage cooling, APW spare |
LHC
RF 28th January 09 |
LHC planning, ACN study,
Discussion on spare cavities |
LHC
RF 11th March 09 |
LHC planning, Risk review,
Crab cavities |
LHC
RF 25th March 09 |
LHC planning, Faraday Cage
air conditioning, Risk review, Crab cavities |
LHC
RF 20th May 09 |
UX45 status, Operation Web
page, Arc detector fibres |
LHC
RF 3rd June 09 |
UX45 status & planning, Operation
dry runs and software, Module 5 testing finished |
LHC
RF 17th June 09 |
UX45 access during
powering, SR4 function distribution and software upgrade, ADT LL
measurements |
LHC
RF 1st July 09 |
Abort gap cleaning, OASIS,
SR4 software |
LHC
RF 15th July 09 |
UX45 status, Vacuum chamber
alignment, RBAC |
LHC
RF 13th Aug 09 |
UX45 status, ADT HOM port
measurements, RBAC tests, LLRF calibrations |
LHC
RF 23rd Sep 09 |
Rupture disc & He release,
ADT dry run, UX45 power sweep tests, Fire brigade radio system |
LHC
RF 4th Nov 09 |
Plans for beam
commissioning |
LHC
RF 16th Dec 09 |
Plans for work during
technical stop |
|
|
2008 Meetings
LHC
RF 11th January 08 |
UX45 status, vacuum gauge
calibration, RF radiation safety, LLRF progress, ADT PIMs working, ADT LL
progress |
LHC
RF 17th January 08 |
ACS conditioning restarted,
software problems, 3.3V power supplies, ADT LL
progress |
LHC
RF 24th January 08 |
Conditioning progress, LLRF
progress, ADT status |
LHC
RF 31st January 08 |
Power & field calibrations, LLRF
commissioning progress, ADT status, Beam observation status |
LHC
RF 7th February 08 |
Conditioning 4-5 nearly
completed, LLRF commissioning results, ADT status |
LHC
RF 15th February 08 |
Results of LLRF
commissioning on 2 cavities, ADT LL status |
LHC
RF 22nd February 08 |
Conditioning 4-5 complete, LLRF
commissioned on 3 cavities, Preparation for 3-4 cooldown, ADT status |
LHC
RF 27th March 08 |
UX45 status, SR4
outstanding work, Emittance blowup, SPS rephasing |
LHC
RF 3rd April 08 |
Point 4 remaining work,
LLRF progress, SM18 |
LHC
RF 17th April 08 |
UX45 status, ADT status,
LLRF status, Beam observation status, 5TeV parameters |
LHC
RF 8th May 08 |
Point 4 status, LLRF status,
Beam Control test bench, Function generator installation, SPS rephasing |
LHC
RF 15th May 08 |
Point 4 status, LLRF status,
Beam phase and position modules fabrication problem and recovery |
LHC
RF 22nd May 08 |
Motor control progress,
Function Generators installed, Beam Control tests progress |
LHC
RF 5th June 08 |
Risk from bakeout, Beam Control tests progress,
SPS rephasing successful |
LHC
RF 12th June 08 |
Radiation safety, LL
status, Beam Control tests progress |
LHC
RF 26th June 08 |
Commissioning plans for
sector 3-4, Coupler control problems solved, Software progress |
LHC
RF 3rd July 08 |
Sector 3-4 commissioning,
SPS rephasing & synchro, LLRF progress, ADT status, US-LARP progress |
LHC
RF 24th July 08 |
Sector 3-4 progress, LLRF
and ADT LL status, Access + DSO tests, Preparation for injection test |
LHC
RF 19th Aug 08 |
UX45 status, ADT, LL and
beam control status, beam commissioning procedures |
LHC
RF 18th Sep 08 |
Beam control commissioning,
ADT status, Protection against clock failure |
LHC
RF 2nd Oct 08 |
Beam commissioning of LLRF
and ADT, APW status, Crate power supplies, Software issues |
LHC
RF 16th Oct 08 |
Tunnel status and sector
3-4 repair planning, Tuner repair, LLRF and APW status |
LHC
RF 13th Nov 08 |
LHC
repair planning, SM18 planning, Spare cavities, LLRF progress |
LHC
RF 18th Dec 08 |
LHC planning,
Tuner repairs, Faraday Cage cooling |
|
|
2007 Meetings
LHC
RF 19th January 07 |
Installation status and
planning. ADT & amplis, LLRF Conditioning module test SM18, VME modules
progress, Diagnostics, Beam Interlocks, Budget. |
LHC
RF 26th January 07 |
Installation status and
planning-Update. LLRF Switch&Prot test SM18, BIC interlocks, Beam Quality. |
LHC
RF 9th February 07 |
Installation-Update.
Couplers & SM18, LLRF, UPS & Faraday cages, SR4 electrical for ACS. |
LHC
RF 23rd February 07 |
Installation-Update
Week 8. ACS SC & Cryo discuss,, LLRF Setpoint Phase module (FBT) |
LHC
RF 2nd March 07 |
Installation-Update Week 9. SA2 and klystron, LLRF Digital F/b tests |
LHC
RF 9th March 07 |
Installation-Update Week 10. SA2 klystron - Move to H112? Cryo He tank
pressures, C line, LLRF Feedback tests. PLC logging operational UX45 |
LHC
RF 16th March 07 |
Installation Status Week 11. ACS single cavity & LLRF tests, Klystrons, Move
SA2 condit. to H112, LLRF Feedback tests and damper electronics |
LHC
RF 23rd March 07 |
ICC news, P4 Status, Klystrons & Thales visit, Move Coupler tests to H112, ACS single cavity & LLRF tests, LLRF Feedback tests
1 and
2. |
LHC
RF 29th March 07 |
P4 status, water, Klystrons & Thales,
Single cavity coupler leak, H112, LLRF tests |
LHC
RF 5th April 07 |
UX45 update-water flowing, Klystrons & Thales,
H112 test stand, Single cavity coupler leak, LLRF modulator tests, series
production Special Topic: MTF for HW commissioning (B Perea Solano) |
LHC
RF 19th April 07 |
UX45 update, Klystrons &
Thales, H112 test stand, ADT and APW update, LLRF modulator, series
production, Controls, Budget problems. |
LHC
RF 26th April 07 |
P4 Installation, Klystron
power tests, ADT RF power tests, LLRF 100 series
modules delivered. |
LHC
RF 10th May 07 |
P4 Installation and
commissioning, SM18 tests,
ADT LLRF layout, LLRF series production,
CtC and Budget |
LHC
RF 24th May 07 |
P4 Roof, Vacuum &cryo work,
ACS power tests, ADT tests, SM18 |
LHC
RF 31st May 07 |
P4-General
Planning, Commissioning, ACS-Pressure tests done, cryo commissioning,
LLRF production and status, Polar loop tests in SM18 ADT LLRF & design
office |
LHC
RF 7th June 07 |
P4 & Commissioning, SR4, ACS,
ADT status, LLRF-polar loop tests and series production for cavity
feedbacks. |
LHC
RF 14th June 07 |
P4 Planning, Commissioning, LLRF
series production status. |
LHC
RF 28th June 07 |
P4 Planning
again, Cryo Status, Vacuum, Klystrons & Boilers, LLRF series production
for conditioning and UX45 commissioning. |
LHC
RF 5th July 07 |
P4 planning, ADT and APW
bakeout status, Cryo and QRLX vacuum, Klystron boilers, ACS controls racks,
Faraday cage VME crates, SM18 and cryoplant. |
LHC
RF 26th July 07 |
P4 planning, Cryo status
P4, vacuum, Klystron boilers, SM18 Cryoplant, Controls & FC final cabling.
ACS RF cables testing, Cavity Controller series production, Patch cables for FCs. |
LHC
RF 2nd August 07 |
P4 planning, Cryo D-Line
issues,
P4 vacuum, ADT & transfer response, SM18 Cryoplant&module 4, Cavity Controller series production,
ADT & 1T fb modules, Patch cables for FCs. MTF Data base & HWC |
LHC
RF 16th August 07 |
P4 planning, Module
cooldown,Klystron boilers,LLRF in Faraday cages, ADT Amplis completed, APW
feedthroughs, SM18 in action again, module4 & level tests, LLRF module,
Spares LTC. |
LHC
RF 30th August 07 |
P4 planning, UX45 Work, ACS
klystrons & HV, Controls software, LLRF-UX45 & modules, SM18, H112 and
coupler conditioning. |
LHC
RF 13th Sept. 07 |
P4 planning, UX45 & RUX45 Work, ACS
klystrons, Lab Control Room and applications, LLRF-UX45 & modules, SM18
status, H112 and
coupler conditioning restart. Aob_MTF review, Spares |
LHC
RF 27th Sept. 07 |
P4 status, UX45 & RUX45
Work, LLRF-UX45 & modules status, SM18 status, H112 and coupler
conditioning. MTF and hardware commissioning, EDMS Structure for LLRF
modules,
Spares Policy |
LHC
RF 11th Oct. 07 |
P4 status-Cool-down 4-5
planned November. Vacuum pressure rise in M1.B2. UX45 & klystrons& ADT power
tests, LLRF DDS drive & cables in UX45 FCs,
SM18 planning w S. Claudet, safety for HWC 1-day review. |
LHC
RF 18th Oct. 07 |
Planning, Nov-Dec,
Christmas? Module2.B2 vacuum, LLRF in FC, klystron remounting sector 3-4. |
LHC
RF 25th Oct. 07 |
P4 planning, Access tests
preparation, Module2.B2 vacuum, Klystrons UX45 water, ADT amplis&tests, SM18
Module 4 tubes. |
LHC
RF 8th Nov 07 |
P4 planning, Access tests
discussions/decisions?, Module2.B2 vacuum gauge fixed, Cryo status-instrumentation!Klystrons UX45
3-4 tests start, LLRF in Faraday cages, SM18 Spare cavity test delayed -
Cavity op=no magnet powering when cavities cold, management of RF tests. |
LHC
RF 21st Nov 07 |
P4 cryo progress, First
tests on Access systems, RP measures in P4. Module2.B1 filled, Vacuum
activities remaining, Preparation for RF tests.. |
LHC
RF 28th Nov 07 |
ACS low power tests
started, cryo stability, vacuum issues, ACS power, RF power commissioning
and planning |
LHC
RF 13th Dec 07 |
ACS conditioning started,
power commissioning, LLRF progress, ADST power LLRF comissioning w/g. |
LHC
RF 20th Dec 07 |
ACS conditioning progress, LLRF progress. |
2006 Meetings
LHC
RF 13th January 06 |
ACS Modules 4,2,5. ACS
Couplers 126-128, ACS power-HV box, ADT kicker, amplis & APW progress LLRF -
klystron transients, future LLRF presentations, Controls, UX45 status |
LHC
RF 20th January 06 |
ACS MC126-128, ACS Tuner
mechanics, cryo valves, survey. ACS power SM18, HV box, LEP circulators. ADT
first kicker BO, LLRF workload, Controls - system development, digitizer
contract. UX45 status - CV, cabling, WG installation, |
LHC
RF 7th February 06 |
UX45 status ACS MC126/127, ACS
Module 5, ADT
first kicker BO, Amplis, APW feedthroughs, Special topic "ACS Cavity
Controller Simulations" |
LHC
RF 17th February 06 |
Installation planning, ACS
Modules 3,5,4 ADT electrode checks, anode supplies tests, ampli resistors, APW feedthroughs,
Controls, LLRF |
LHC
RF 24th February 06 |
ACS
Modules 2,3,5, lifting support, ADT anode supplies tests, ampli resistors, APW
for SPS,
Controls-Ethernet & FGC, |
LHC
RF 3rd March 06 |
Installation progress, ACS
couplers 126-129, ACS Modules 3 & 5, Klystron HV box, ADT Converters &
kickers production. |
LHC
RF 10th March 06 |
ACS
couplers 128/129, ACS Modules 3 & 5, ADT
kickers production. Installation progress, vacuum layout. cryo planning, LSS
review-RF issues at IR4 |
LHC
RF 17th March 06 |
ACS couplers 128/129, ACS
Modules 3,planning. ADT
kickers assembly completed. LLRF and tests, ACS converters, Installation
progress, vacuum layout, LSS
review-RF issues at IR4 |
LHC
RF 24th March 06 |
ACS couplers 128/129, ACS
Modules 3&5, ADT, Controls tests. UX45 installation, SR4, Vacuum
layout, LSS review |
LHC
RF 31st March 06 |
ACS couplers 128/129/130,
ACS Module 5, Cryo connections, ACS power spares, Controls FESA&IEPLC, LLRF
Crates production, UX45 installation, Vacuum
layout, LSS review. |
LHC
RF 21st April 06 |
ACS couplers 128/129,
ACS Module 5, connects to QRL Exts, ADT&APW progress, Controls, UX45
planning&installation, HWC mini review. |
LHC
RF 12th May 06 |
ACS couplers 123/128,
ACS Module 5, QRL Exts connect test, ADT&APW progress, Controls,
LLRF-connectors, patch cables. UX45 Installation restart, SR4 control area,
bunch length h/w for LEADE |
LHC
RF 18th May 06 |
Special Topic - Status of
LLRF hardware and Software |
LHC
RF 26th May 06 |
ACS couplers, module 5
progress, ACS power, APW production, UX45 waveguide holes, 3/8 connectors |
LHC
RF 2nd June 06 |
ACS couplers seals, module 5
tested, UX45 status & photos, 3/8 connectors, LLRF - VME crates & modules |
LHC
RF 9th June 06 |
ACS, module 5
conditioning, Seals, UX45 status - false floor/earthing. |
LHC
RF 16th June 06 |
ACS, module 5
heat running, ADT, APW, UX45 status |
LHC
RF 23rd June 06 |
ACS, module 5
heat running, APW & BakeOut, ADT&867tests,UX45 status, AoB, Interlocks, HWC
Review, Planning RF Tests |
LHC
RF 30th June 06 |
ACS, ADT, APW & BakeOut,
UX45 status, R/T: LLRF devices, Crates, ADT controls/interlocks. |
LHC
RF 7th July 06 |
ACS, ADT, APW, UX45 status, LLRF
Modules, Crates |
LHC
RF 14th July 06 |
ACS 1 & 5, Module
Names, APW, LLRF-RF
distribution, UX45 status |
LHC
RF 28th July 06 |
ACS and couplers, ADT -
Dubna & resistors, UX45 and planning, Controls & LLRF |
LHC
RF 4th August 06 |
ACS and couplers, (R)UX45
status & installation preparation, Layout drawings |
LHC
RF 11th August 06 |
(R)UX45
installation & preparation, Special Topic "The
ACS RF Distribution Systems" |
LHC
RF 18th August 06 |
(R)UX45 Floor markink,
equipment installation, first module transport, LLRF ADT tests |
LHC
RF 1st September 06 |
Installation of ACS modules
in RUX45,
equipment installation and tests in RUX45/UX45 photos, ACS and couplers, LLRF
modules status, LSS P4 HW commissioning |
LHC
RF 15th September 06 |
RUX45 UX45 installation
progress and photos, ADT amplis, ACS and couplers, LLRF
modules status |
LHC
RF 22nd September 06 |
ACS coupler MC130 and test
cavity, UX45 installation
progress and photos, ACS HOM proposal. |
LHC
RF 29th September 06 |
UX45 installation -
alignment, SR4, ACS HOMs, LLRF, HW Commissioning. |
LHC
RF 6th October 06 |
RUX/UX45 installation -
alignment-WGs-Bunkers-Cabling-Networks, ACS, ADT,A0B-LEIR-ADT-H112 |
LHC
RF 20th October 06 |
RUX/UX45 installation -
Cabling, 3rd Bunkers-HOM protection, Couplers, Modules, ADT,Controls, LLRF,
conditioning/SM18 single cavity, HWC - Cry & RF co-activity. |
LHC
RF 27th October 06 |
RUX/UX45 progress-Cabling-3rd Bunker-HOM protection, Couplers
132,133 131,134, ACSCA LHC 21, ADT, LLRF Dual DDS I&Qplots-setpoint,
Electricity Jan07, Biocells |
LHC
RF 10th November 06 |
ACS Couplers 131-134,
Cavity21, ADT Amplis,MAC,PIMs, UX45-various, LLRF modules & crates, Tools
support. |
LHC
RF 24th November 06 |
ACS Couplers 131-134,
Cavity21, ADT Amplifier completion, UX45-various, LLRF crates, Tools
support, ADT racks & SR4 DICs and cabling to organize. |
LHC
RF 1st December 06 |
UX45 installation,
Couplers 131/4 Cavity21, Module4 SM18 New Conditioning preparation, ADT
Russian visit, APW feedthroughs, LLRF series prodn. FSU. |
LHC
RF 8th December 06 |
ACS Couplers 131/4, Module4,
Cavity21 & new conditioning prep., UX45 status & pics., LLRF status list,
Acquiris modules. |
LHC
RF 22nd December 06 |
ADT Amplis completion and
UX45 supports, UX/RUX45 installation-cabling-water-HV&PCtests,
commissioning, 2007 milestones, SR4 enclosure in place. ACS MC 132/133,
conditioned-131/134 mounted. Module4 complete,
Cavity21 & new conditioning module first test |
2005 Meetings
LHC
RF 7th January 05 |
ACS Modules 3,5. ACS
Couplers 118-119, ADT review & Dubna visit, Coax cables order, Installation
UX45, Cryo rediscussions, LLRF and controls news |
LHC
RF 14th January 05 |
ACS Module 3, SM18 Planning
2005, ACS Power, ADT, UX45 Instlln and Planning, Access meeting Jan05, Software program. |
LHC
RF 4th February 05 |
CE work in UX45, layout in
UX45. ACS Module 5 and tuning. ADT & Dubna work, cabling. Faraday cages,
Controls. |
LHC
RF 11th February 05 |
Couplers 118-121, ACS
Cavity Tuning Status & actions, ADT, LLRF, Beam Dump Interlocks. |
LHC
RF 18th February 05 |
Couplers 118-121, Soleil
Incident, Modules, ADT, LLRF, UX45, Beam Dump Interlocks. |
LHC
RF 25th February 05 |
ACS Couplers, SC Cavity
tuning details, ACS Cryo meeting, ADT, LLRF Tuner ctrl & F/B, Acquisition
systems. Access system & valves |
LHC
RF 4th March 05 |
ACS Couplers, Second SM18
He incident, B867 test area, LLRF Tuner module, ACS Cryo Beam permit
interlocks. |
LHC
RF 11th March 05 |
ADT Dubna visit, ACS
MC116-119, SM18 incident-meeting with Cryo, ACS 5B Tuner Measurements. LLRF Tuner module,
UX45, Controls&SR4, Beam Permit for RF. |
LHC
RF 18th March 05 |
ADT, SM18 incidents at DSOC,
Klystron ripple results, LLRF, Layouts-UX45, Machine Protection. |
LHC
RF 1st April 05 |
ACS Module 3, couplers
120/121, ADT supplies & amplis,B867, Klystron ripple, LLRF, Cryo WRL,
Diagnostics and SR4. |
LHC
RF 8th April 05 |
ADT & MP Review, ACS
Couplers 120/121+Modules 3&5, LLRF, UX45 integration & General
Planning April 05 |
LHC
RF 15th April 05 |
ACS
Couplers 120/121+Modules 3&5, ADT & Dubna, UPS UX45 & SR4, LLRF-Timing,
UX45 integration and installation |
LHC
RF 29th April 05 |
ACS
Couplers 120/12, Modules 2&5, ADT & Dubna, Flexwell cables
order; Electrical layouts, racks cabling, UX4 installation |
LHC
RF 13th May 05 |
ACS Module 2, Couplers, ADT
anode supplies factory tests, Access system logic, APW presentation, HOM
cables routing |
LHC
RF 27th May 05 |
UX45 Installation, ACS
couplers and modules, ADT, LLRF |
LHC
RF 3rd June 05 |
UX45 Installation and
integration, ACS couplers & modules, ADT & B867 test stand, Software &
controls |
LHC
RF 10th June 05 |
UX45 Installation and
integration, ACS couplers & modules, ADT & B867 test stand, Rack
Layouts ACS & status |
LHC
RF 17th June 05 |
ADT-Dubna shipment-B867,
ACS couplers & Module 2, APW, LLRF Overview, Installation and
integration+UX45 Pictures |
LHC
RF 24th June 05 |
ACS MC122-125. M2
tests&tuning, B867 ADT ampli&tank, APW&plating UX45 progress, Faraday cages,
Access conditions |
LHC
RF 1st July 05 |
UX45 CE progress, MC122-125. M2
cond.&LLRF tests, 1st test tuning compens Cav5B, SR4 floor, BDI & radiation
meeting. |
LHC
RF 22nd July 05 |
ACS, ADT, APW, LLRF, UX45 &
CE work, RUX45 access & radiation, cryo wrl. |
LHC
RF 5th August 05 |
ACS, B867 APW, UX45 status |
LHC
RF 12th August 05 |
ACS couplers, modules
& power, APW, UX45 status, Access system |
LHC
RF 19th August 05 |
SM18 - Module 2 bellows
incident, Acquistion Systems, ACS Couplers, ADT Review, Flexwell cables,
LLRF, Installation UX45 |
LHC
RF 2nd September 05 |
SM18 - Coupler MC122, ACS
Domes module 5, spring comp delataT, ADT kickers planning, Controls Status
Present., UX45 Installn & access proposal SC-RP |
LHC
RF 16th September 05 |
UX45 installation planning, SM18
planning -Couplers test stand status, ADT, Faraday cages delivered |
LHC
RF 23rd September 05 |
SM18- HOM meas. M2 and
LLRFtests, APW, ADT, UX45 installation. |
LHC
RF 30th September 05 |
Coupler test stand, ACS
modules 2, 5 HOM tests contd. Points following SM18 LLRF tests, ADT, UX45
installation, cabling. |
LHC
RF 7th October 05 |
UX45 installation status, ACS
modules 2&5, ADT, ACS HOM loads |
LHC
RF 21st October 05 |
ADT Dubna news JINR collab.
ACS Module5 springs result, Module 2D field, ACS klystrons, APW LLRF
Controls, UX45 installn. |
LHC
RF 28th October 05 |
Round Table: UX45
(platform), Last Klystron accepted, ACS SM18 + documentation, ADT-Delivery
from JINR, APW test, Racks grounding. Annex: ACS couplers, ADT
power-amplis-supplies, APW construction. |
LHC
RF 4th November 05 |
ACS Modules 5 (springs) &
2. Klystrons - satur. curves. UX45-Platform problems, cabling, initial
vacuum planning. ADT, APW LLRF,Software. |
LHC
RF 11th November 05 |
SA2 progress MC 126/7,
Modules 4&5, ACS power, ADT, APW tests LLRF & diagnostics, UX45 installation
- platform, cabling progress |
LHC
RF 18th November 05 |
ACS Couplers 124-128,
Module4, domes&bellows, ADT first 3 tanks, electrode tests, supports. APW
planning&tests. UX45 - platform 'blocked'. |
LHC
RF 25th November 05 |
ACS MC124-127, SM18
planning, ADT electrode tests, Anode converter delivery, Klystrons HV box.UX45 platform
& wall status |
LHC
RF 2nd December 05 |
ACS MC124-127 M4, SM18
planning, ADT 4 Anode conv, Klystrons HV box, APW progress, Controls, UX45 platform
& wall, LLRF |
LHC
RF 9th December 05 |
UX45 Walls and platform, ACS M4
tuner drive & bellows, APW progress, LLRF VTU and Fibres |
2004 Meetings
LHC RF 7th Jan 04 |
UX45 Final Layout, SM18, ACS Couplers, ADT Collaboration |
LHC RF 16th Jan 04 |
UX45, LHC Access, Couplers, He Valves, ADT, Budget, HOM
filters, Klystrons & LLRF, Dust Traps |
LHC RF 30th Jan
04 |
ACS Couplers,SM18, Cryo,ACS Power,UX45, LLRF Electronics |
LHC RF 6th Feb
04 |
ACS Couplers, Power, SM18, Cryo, UX45, Integration & Layout,
ADT, EVM |
LHC RF13th Feb
04 |
SM18, Module3,Cryo-Valves & He release, Vacuum layout in
RUX45, ADT kickers, Power Amplifier, Supplies |
LHC RF 20th Feb
04 |
ADT, Dust Traps, Module 3, ACS couplers, IR4, Access. |
LHC RF 27th Feb
04 |
Special meeting on Low Level RF for LHC (Philippe
Baudrenghien) |
LHC RF 5th March
04 |
ACS & ADT news. Dust traps. Recent
discussions-Vacuum,UX45Cooling, Naming. UX45 radiation and plot |
LHC RF 12th March
04 |
SM18 - Planning & organisation of tests, ADT news, General
planning & RF installation, Dust traps |
LHC RF 19th March
04 |
ACS Couplers&SM18, Equipment naming, Cryo
Meeting, Commissioning and planning, LLRF progress |
LHC RF 26th March
04 |
SA2 klystron & Coupler conditioning
options, SM18, Planning, Naming, ADT, PVSS, SM18 responsibilities |
LHC RF 2nd April
04 |
SA2 klystron, SM18, Layout&Planning, ADT,
Faraday Cages UX45 |
LHC RF 16th April
04 |
SA2 mods for LHC klystron, Flexwell cable
& Faraday cage procurement, UX45 CV, LLRF status |
LHC RF 23rd April
04 |
ADT, ACS couplers-SA2-Klystron, ACS &
Cryo, Market Surveys |
LHC RF 30th April
04 |
Cost Indexing, Market Surveys, ADT,
Commissioning, SM18, SA2, ACS. Klystron 9, EMC demo with AB-PO |
LHC RF 7th May
04 |
SA2 klystron operational, ACS, ADT,
Commissioning, Controls - AB-CO/TC. |
LHC RF 14th May
04 |
LLRF and RF Feedback module, SA2, ACS
Couplers, Klystrons, SM18 |
LHC RF 4th June 04 |
ACS
Couplers, SM18, ADT, SR4 layout |
LHC RF 11th June 04 |
ACS
Couplers - conditioning experience in SA2, SM18 Planning, SR4 Control Room
final layout |
LHC RF 18th June 04 |
ACS
Couplers/Modules/SM18, ADT, Operations Naming, Signal Monitoring, Software
Plan |
LHC RF 2nd July 04 |
Installation Planning Overview, Equipment
Naming, DiC Conventions |
LHC RF 30 July 04 |
ACS klystrons, couplers, modules. SM18
klystron Test. ADT |
LHC RF 6th August 04 |
ACS module 1 bake-out, ACS Couplers,
Progress on layouts & cabling |
LHC RF 13th August 04 |
SM18 Progress, ADT. Cabling, Integration,
Commissioning, EVM |
LHC RF 20th August 04 |
SM18 Module 3 coupler incident |
LHC RF 27th August 04 |
SM18 Module 3 coupler incident - follow
up, ACS Couplers & Power. Planning latest, EVM |
LHC RF 3rd September 04 |
ADT review, Installation & Planning, ACS Couplers
& Module 1, ACS Power. |
LHC RF 17th September 04 |
ACS Couplers, Power & Modules, SR4,
Pick-Ups, LLRF |
LHC RF 24th September 04 |
ACS, ADT, Naming |
LHC RF 1st October 04 |
Installation Planning, 867 Test Stand, ADT,
ACS, LLRF status |
LHC RF 8th October 04 |
SM18 ACS Module1, Coupler 113,
Cables/Faraday cages, ADT & Tunnel layout, LLRF |
LHC RF 22nd October 04 |
UX45 Faraday cages, SM18 ACS Module1, Couplers 113&114,
Klystron test in SM18 |
LHC RF 29th October 04 |
ACS Module1, Couplers 114&115, UX45
Planning, Coax cables, Klystron ripple measurements |
LHC RF 12th November 04 |
ACS Module5, Couplers 114-117, UX45
and earthing, Coax cables |
LHC RF 19th November 04 |
ADT & B867, Module5, Couplers 114-117,
Klystron ripple, Controls |
LHC RF 26th November 04 |
ADT, Cables, Cryo lines, ACS,
Klystron ripple compensation, EMC
Workshop |
LHC RF 3rd December 04 |
ACS, Cables, UX 45 Installation, Naming,
ACS Power Converter ripple |
LHC
RF 10th December 04 |
ACS Modules 3,5. ACS
Couplers 111-117, ACS power&ripple. Noise specs for ACS, Cables, UX45 cryo
lines, LLRF |
2003 Meetings
LHC RF 12th Feb 03 |
EVM organization, review of action list, UX45 layout,
radiation&electronics. |
LHC RF 19th Feb 03 |
UX45 Infrastructure, Report of meeting on cooling systems
with ST-CV, Radiation UX45 |
LHC RF 26th Feb 03 |
UX45 Layout, UX45 layout & Infrastructure, Storage, SM18
upgrade. |
LHC RF 12th Mar 03 |
EVM, UX45 integration |
LHC RF 19th Mar
03 |
EVM, Earthing, Racks, ACS Power Coupler results in SA2 |
LHC RF 26th Mar
03 |
Earthing UX45, EVM, Racks + SR4, ADT PC specification |
LHC RF 2nd Apr 03 |
EVM, Report on First IR4 Integration meeting of 26th March,
ACN news, Radiation |
LHC RF 9th Apr 03 |
EVM & CtoC, Integr./Infras. IR4 -Cryo, CV, shielding,
Cabling & trays, ADT, SM18 upgrade |
LHC RF 30th Apr 03
|
Special meeting on cabling |
LHC RF 7th May 03 |
UX45 Layout status, Review of vacuum controls |
LHC RF 14th May 03
|
Installation of ACS modules, access to equipment, HOMC loads
in LEP, proposals for LHC. |
LHC RF 21st May 03
|
Follow-up ACS installation, access, HOMC Loads |
LHC RF 28th May 03 |
Vacuum equipment & layout, Vacuum controls, ACN Cavity 8 |
LHC RF 4th June 03 |
HOMC loads, Klystron cooling, Radiation, LLRF |
LHC RF 11th June 03 |
Proposal for
ACS
HOMC Connections, klystron delivery, EVM 'stability', ADT news, LLRF |
LHC RF 18th June 03
|
EVM, Power Coupler planning, VME Crates. |
LHC RF 25th June 03
|
Power Couplers, HOMC cable loads - agreed layout, CE in
UX45. |
LHC RF 9th July 03 |
ACS Power Coupler progress, SM18 & module cycling, ADT status and news,
UX45 radiation prelim results, Warm recovery line, LLRF Planning, UX45
integration outstanding items. |
LHC RF 30th July 03 |
ADT update, P4 Integration, RF devices
|
LHC RF 13th Aug 03 |
Couplers, SM18 Power, Modules, Integration
|
LHC RF 27th Aug 03 |
SM18, ADT, Integration. |
LHC RF 10th Sept 03 |
SM18 power tests, ACS Module3 status, ADT- Converters, feedthroughs,
amplis, cooling,
Radiation in IR4
Soleil |
LHC RF 24th Sept 03 |
SM18, ACS - Module3, 2nd set Power Couplers, P4 Integration Review, RF devices (2),
Software. |
LHC RF 8th Oct 03 |
ADT Review,
P4 Integration, SM18 2nd Bunker. |
LHC RF 15th Oct 03 |
ACS Module 3 status, ACN cavities, LEP equipment in ISR,
Cryo controls, Software, LLRF, UX45 |
LHC RF 22nd Oct 03 |
ACS Module 3, ACS Power Couplers, ADT, P4 Integration, |
LHC RF 29th Oct 03 |
ACS Module 3, ADT news-kickers, power converters, Tunnel
Integration, Front-end Software |
LHC RF 5th Nov 03 |
ACS Module 3 - status and frequency measurements, Tunnel
Integration review, ACS Warm Recovery Line |
LHC RF 12th Nov 03 |
ACS Module 3, RUX45 Integration follow up, Report on LHC
Integration Day |
LHC RF 20th Nov
03 |
ACS Module 3, RUX45 Integration, Presentations and Points
from AB-LTC review |
LHC RF 26th Nov
03 |
Vacuum/Radiation in UX45, Integrarion, ACS module 3 (full
power applied to 3/4 couplers) |
LHC RF 3rd Dec
03 |
Report on expected vacuum in IR4, Progress ACS Module 3,
Integration UX45-LLRF racks siting |
LHC RF 10th Dec
03 |
Status of ACS module 3 (Full power on all couplers-7MV/m in
cavity C), Radiation & LLRF racks positioning. |
LHC RF 17th Dec
03 |
Postioning of LLRF racks in UX45 |
2002 Meetings
Special Meetings
Cryo 20th Oct 01 |
ACS cryo issues |
Cryo 26th Sept 01 |
ACS cryo issues |
Cryo 23rd Nov 01 |
ACS cryo issues |
Cryo Scenarios 26th Nov 01 |
Cryo parameters |
Cryo 10th June 02 |
RF installation cryo side UX45 |
Cryo 8th July 03 |
Rigid cryo line |
Meeting on Cryo and safety issues for ACS 12th March 04 |
He valves and safety, Operation &
Commissioning, Controls, Planning. |
Follow up Cryo issues and He circuits 21st April 04 |
Quench valves and connections, protection
valves, WRL |
Cryo-Requirements & Options 4th January 05 |
Summary of requirements & He supply options
review - Pre LHC Perf W/shop - by AT-CR |
Reply
input on Cryo requirements and Options |
Feedback and additions to above |
Cryogenics Distribution for
400 MHz RF system - 18th Feb 2005 |
Follow up of proposals from
Chamonix 2005 presentation - S. Claudet |
SM18 Program
Oct 2007 |
Plans for sM18 operation &
priorities, 2007 early 2008, with S. Claudet |
|
|
Cooling Water Systems
11th October 02 |
UX45, Chilled water requirements, Maintenance in test stands |
|
|
Access in UX45 9th Jan 02 |
|
Access in RUX45 15th
Jan 04 |
With OP, BDI, RF and VAC groups |
Reply to issues raised
RUX45 Access Meeting
18th Feb 04 |
|
Summary
of meeting on RUX45 access 11th Jan 05 |
Handling of 'RF Enable' mode. Access
interlock handling |
|
|
|
|
Grounding P4 3rd March 03
|
|
|
|
|
|
P4
Vacuum 7th August 2003 |
|
ADT Vacuum
16th Feb 2004 |
|
IR4 Vacuum 23rd Feb
2004 |
With M. Jimenez |
|
Copyright or other proprietary statement goes here.
For problems or questions regarding this web contact
[Email] or
[Email]
Last updated:
11/09/10 11:43:20 AM.
|