Regular Meetings 2002 2003  2004 2005 2006 2007 2008 2009 2010    
Special Meetings all  
Follow up list-November 2003 Actions by meetings
  From 2004 LHC RF Meetings                    
                       
                       
                       
                       

2010 Meetings

LHC RF 10th February 10 Preparation for 2010 startup, Circulator measurements & adjustments, Collector power, ADT noise & cables, Piquet organisation
LHC RF 19th May 10 ACS status and reliability, VME interrupt problem, Beam stability
LHC RF 29th September 10 Arc detectors, C4B1 noise, ADT performance and future plans
LHC RF 20th October 10 Presentation: Noise-induced diffusion, Setup for ions and 2011 protons

2009 Meetings

LHC RF 14th January 09 LHC status + planning, Tuner repairs, Faraday cage cooling, APW spare
LHC RF 28th January 09 LHC planning, ACN study, Discussion on spare cavities
LHC RF 11th March 09 LHC planning, Risk review, Crab cavities
LHC RF 25th March 09 LHC planning, Faraday Cage air conditioning, Risk review, Crab cavities
LHC RF 20th May 09 UX45 status, Operation Web page, Arc detector fibres
LHC RF 3rd June 09 UX45 status & planning, Operation dry runs and software, Module 5 testing finished
LHC RF 17th June 09 UX45 access during powering, SR4 function distribution and software upgrade, ADT LL measurements
LHC RF 1st July 09 Abort gap cleaning, OASIS, SR4 software
LHC RF 15th July 09 UX45 status, Vacuum chamber alignment, RBAC
LHC RF 13th Aug 09 UX45 status, ADT HOM port measurements, RBAC tests, LLRF calibrations
LHC RF 23rd Sep 09 Rupture disc & He release, ADT dry run, UX45 power sweep tests, Fire brigade radio system
LHC RF 4th Nov 09 Plans for beam commissioning
LHC RF 16th Dec 09 Plans for work during technical stop
   

2008 Meetings

LHC RF 11th January 08 UX45 status, vacuum gauge calibration, RF radiation safety, LLRF progress, ADT PIMs working, ADT LL progress
LHC RF 17th January 08 ACS conditioning restarted, software problems, 3.3V power supplies, ADT LL progress
LHC RF 24th January 08 Conditioning progress, LLRF progress, ADT status
LHC RF 31st January 08 Power & field calibrations, LLRF commissioning progress, ADT status, Beam observation status
LHC RF 7th February 08 Conditioning 4-5 nearly completed, LLRF commissioning results, ADT status
LHC RF 15th February 08 Results of LLRF commissioning on 2 cavities, ADT LL status
LHC RF 22nd February 08 Conditioning 4-5 complete, LLRF commissioned on 3 cavities, Preparation for 3-4 cooldown, ADT status
LHC RF 27th March 08 UX45 status, SR4 outstanding work, Emittance blowup, SPS rephasing
LHC RF 3rd April 08 Point 4 remaining work, LLRF progress, SM18
LHC RF 17th April 08 UX45 status, ADT status, LLRF status, Beam observation status, 5TeV parameters
LHC RF 8th May 08 Point 4 status, LLRF status, Beam Control test bench, Function generator installation, SPS rephasing
LHC RF 15th May 08 Point 4 status, LLRF status, Beam phase and position modules fabrication problem and recovery
LHC RF 22nd May 08 Motor control progress, Function Generators installed, Beam Control tests progress
LHC RF 5th June 08 Risk from bakeout, Beam Control tests progress, SPS rephasing successful
LHC RF 12th June 08 Radiation safety, LL status, Beam Control tests progress
LHC RF 26th June 08 Commissioning plans for sector 3-4, Coupler control problems solved, Software progress
LHC RF 3rd July 08 Sector 3-4 commissioning, SPS rephasing & synchro, LLRF progress, ADT status, US-LARP progress
LHC RF 24th July 08 Sector 3-4 progress, LLRF and ADT LL status, Access + DSO tests, Preparation for injection test
LHC RF 19th Aug 08 UX45 status, ADT, LL and beam control status, beam commissioning procedures
LHC RF 18th Sep 08 Beam control commissioning, ADT status, Protection against clock failure
LHC RF 2nd Oct 08 Beam commissioning of LLRF and ADT, APW status, Crate power supplies, Software issues
LHC RF 16th Oct 08 Tunnel status and sector 3-4 repair planning, Tuner repair, LLRF and APW status
LHC RF 13th Nov 08 LHC repair planning, SM18 planning, Spare cavities, LLRF progress
LHC RF 18th Dec 08 LHC planning, Tuner repairs, Faraday Cage cooling
   

2007 Meetings

LHC RF 19th January 07 Installation status and planning. ADT & amplis, LLRF Conditioning module test SM18, VME modules progress, Diagnostics, Beam Interlocks, Budget.
LHC RF 26th January 07 Installation status and planning-Update. LLRF Switch&Prot test SM18, BIC interlocks, Beam Quality.
LHC RF 9th February 07 Installation-Update. Couplers & SM18, LLRF, UPS & Faraday cages, SR4 electrical for ACS.
LHC RF 23rd February 07 Installation-Update Week 8. ACS SC & Cryo discuss,, LLRF Setpoint Phase module (FBT)
LHC RF 2nd March 07 Installation-Update Week 9. SA2 and klystron, LLRF Digital F/b tests
LHC RF 9th March 07 Installation-Update Week 10. SA2 klystron - Move to H112? Cryo He tank pressures, C line, LLRF Feedback tests. PLC logging operational UX45
LHC RF 16th March 07 Installation Status Week 11. ACS single cavity & LLRF tests, Klystrons, Move SA2 condit. to H112, LLRF Feedback tests and damper electronics
LHC RF 23rd March 07 ICC news, P4 Status, Klystrons & Thales visit, Move Coupler tests to H112, ACS single cavity & LLRF tests, LLRF Feedback tests 1 and 2.
LHC RF 29th March 07 P4 status, water, Klystrons & Thales, Single cavity coupler leak, H112, LLRF tests
LHC RF 5th April 07 UX45 update-water flowing, Klystrons & Thales, H112 test stand, Single cavity coupler leak, LLRF modulator tests, series production Special Topic: MTF for HW commissioning (B Perea Solano)
LHC RF 19th April 07 UX45 update, Klystrons & Thales, H112 test stand, ADT and APW update, LLRF modulator, series production, Controls, Budget problems.
LHC RF 26th April 07 P4 Installation, Klystron power tests, ADT RF power tests, LLRF 100 series modules delivered.
LHC RF 10th May 07 P4 Installation and commissioning, SM18 tests, ADT LLRF layout,  LLRF series production, CtC and Budget
LHC RF 24th May 07 P4 Roof, Vacuum &cryo work, ACS power tests, ADT tests,  SM18
LHC RF 31st May 07 P4-General Planning, Commissioning, ACS-Pressure tests done, cryo commissioning, LLRF production and status, Polar loop tests in SM18 ADT LLRF & design office
LHC RF 7th June 07 P4 & Commissioning, SR4, ACS, ADT status, LLRF-polar loop tests and series production for cavity feedbacks.
LHC RF 14th June 07 P4 Planning, Commissioning, LLRF series production status.
LHC RF 28th June 07 P4 Planning again, Cryo Status, Vacuum, Klystrons & Boilers, LLRF series production for conditioning and UX45 commissioning.
LHC RF 5th July 07 P4 planning, ADT and APW bakeout status, Cryo and QRLX vacuum, Klystron boilers, ACS controls racks, Faraday cage VME crates, SM18 and cryoplant.
LHC RF 26th July 07 P4 planning, Cryo status P4, vacuum, Klystron boilers, SM18 Cryoplant, Controls & FC final cabling. ACS RF cables testing, Cavity Controller series production, Patch cables for FCs.
LHC RF 2nd August 07 P4 planning, Cryo D-Line issues, P4 vacuum, ADT & transfer response, SM18 Cryoplant&module 4, Cavity Controller series production, ADT & 1T fb modules, Patch cables for FCs. MTF Data base & HWC
LHC RF 16th August 07 P4 planning, Module cooldown,Klystron boilers,LLRF in Faraday cages, ADT Amplis completed, APW feedthroughs, SM18 in action again, module4 & level tests, LLRF module, Spares LTC.
LHC RF 30th August 07 P4 planning, UX45 Work, ACS klystrons & HV, Controls software, LLRF-UX45 & modules, SM18, H112 and coupler conditioning.
LHC RF 13th Sept. 07 P4 planning, UX45 & RUX45 Work, ACS klystrons, Lab Control Room and applications, LLRF-UX45 & modules, SM18 status, H112 and coupler conditioning restart. Aob_MTF review, Spares
LHC RF 27th Sept. 07 P4 status, UX45 & RUX45 Work, LLRF-UX45 & modules status, SM18 status, H112 and coupler conditioning. MTF and hardware commissioning, EDMS Structure for LLRF modules, Spares Policy
LHC RF 11th Oct. 07 P4 status-Cool-down 4-5 planned November. Vacuum pressure rise in M1.B2. UX45 & klystrons& ADT power tests, LLRF DDS drive & cables in UX45 FCs, SM18 planning w S. Claudet, safety for HWC 1-day review.
LHC RF 18th Oct. 07 Planning, Nov-Dec, Christmas? Module2.B2 vacuum, LLRF in FC, klystron remounting sector 3-4.
LHC RF 25th Oct. 07 P4 planning, Access tests preparation, Module2.B2 vacuum, Klystrons UX45 water, ADT amplis&tests, SM18 Module 4 tubes.
LHC RF 8th Nov 07 P4 planning, Access tests discussions/decisions?, Module2.B2 vacuum gauge fixed, Cryo status-instrumentation!Klystrons UX45 3-4 tests start, LLRF in Faraday cages, SM18 Spare cavity test delayed - Cavity op=no magnet powering when cavities cold, management of RF tests.
LHC RF 21st Nov 07 P4 cryo progress, First tests on Access systems, RP measures in P4. Module2.B1 filled, Vacuum activities remaining, Preparation for RF tests..
LHC RF 28th Nov 07 ACS low power tests started, cryo stability, vacuum issues, ACS power, RF power commissioning and planning
LHC RF 13th Dec 07 ACS conditioning started, power commissioning, LLRF progress, ADST power LLRF comissioning w/g.
LHC RF 20th Dec 07 ACS conditioning progress, LLRF progress.

2006 Meetings

LHC RF 13th January 06 ACS Modules 4,2,5. ACS Couplers 126-128, ACS power-HV box, ADT kicker, amplis & APW progress LLRF - klystron transients, future LLRF presentations, Controls, UX45 status
LHC RF 20th January 06 ACS MC126-128, ACS Tuner mechanics, cryo valves, survey. ACS power SM18, HV box, LEP circulators. ADT first kicker BO, LLRF workload, Controls - system development, digitizer contract. UX45 status - CV, cabling, WG installation,
LHC RF 7th February 06 UX45 status ACS MC126/127, ACS Module 5, ADT first kicker BO, Amplis, APW feedthroughs, Special topic "ACS Cavity Controller Simulations"
LHC RF 17th February 06 Installation planning, ACS Modules 3,5,4 ADT electrode checks, anode supplies tests, ampli resistors, APW feedthroughs, Controls, LLRF
LHC RF 24th February 06 ACS Modules 2,3,5, lifting support, ADT anode supplies tests, ampli resistors, APW for SPS, Controls-Ethernet & FGC,
LHC RF 3rd March 06 Installation progress, ACS couplers 126-129, ACS Modules 3 & 5, Klystron HV box, ADT Converters & kickers production.
LHC RF 10th March 06 ACS couplers 128/129, ACS Modules 3 & 5, ADT kickers production. Installation progress, vacuum layout. cryo planning, LSS review-RF issues at IR4
LHC RF 17th March 06 ACS couplers 128/129, ACS Modules 3,planning. ADT kickers assembly completed. LLRF and tests, ACS converters, Installation progress, vacuum layout, LSS review-RF issues at IR4
LHC RF 24th March 06 ACS couplers 128/129, ACS Modules 3&5, ADT, Controls tests. UX45 installation, SR4, Vacuum layout, LSS review
LHC RF 31st March 06 ACS couplers 128/129/130, ACS Module 5, Cryo connections, ACS power spares, Controls FESA&IEPLC, LLRF Crates production, UX45 installation, Vacuum layout, LSS review.
LHC RF 21st April 06 ACS couplers 128/129, ACS Module 5, connects to QRL Exts, ADT&APW progress, Controls, UX45 planning&installation, HWC mini review.
LHC RF 12th May 06 ACS couplers 123/128, ACS Module 5, QRL Exts connect test, ADT&APW progress, Controls, LLRF-connectors, patch cables. UX45 Installation restart, SR4 control area, bunch length h/w for LEADE
LHC RF 18th May 06 Special Topic - Status of LLRF hardware and Software
LHC RF 26th May 06 ACS couplers, module 5 progress, ACS power, APW production, UX45 waveguide holes, 3/8 connectors
LHC RF 2nd June 06 ACS couplers seals, module 5 tested, UX45 status & photos, 3/8 connectors, LLRF - VME crates & modules
LHC RF 9th June 06 ACS, module 5 conditioning, Seals, UX45 status - false floor/earthing.
LHC RF 16th June 06 ACS, module 5 heat running, ADT, APW, UX45 status
LHC RF 23rd  June 06 ACS, module 5 heat running, APW & BakeOut, ADT&867tests,UX45 status, AoB, Interlocks, HWC Review, Planning RF Tests
LHC RF 30th  June 06 ACS, ADT, APW & BakeOut, UX45 status, R/T: LLRF devices, Crates, ADT controls/interlocks.
LHC RF 7th  July 06 ACS, ADT, APW, UX45 status, LLRF Modules, Crates
LHC RF 14th  July 06 ACS 1 & 5, Module Names, APW, LLRF-RF distribution, UX45 status
LHC RF 28th  July 06 ACS and couplers, ADT - Dubna & resistors, UX45 and planning, Controls & LLRF
LHC RF 4th August 06 ACS and couplers, (R)UX45 status & installation preparation, Layout drawings
LHC RF 11th August 06 (R)UX45 installation & preparation, Special Topic "The ACS RF Distribution Systems"
LHC RF 18th August 06 (R)UX45 Floor markink, equipment installation, first module transport, LLRF ADT tests
LHC RF 1st September 06 Installation of ACS modules in RUX45, equipment installation and tests in RUX45/UX45 photos, ACS and couplers, LLRF modules status, LSS P4 HW commissioning
LHC RF 15th September 06 RUX45 UX45 installation progress and photos, ADT amplis, ACS and couplers, LLRF modules status
LHC RF 22nd September 06 ACS coupler MC130 and test cavity, UX45 installation progress and photos, ACS HOM proposal.
LHC RF 29th September 06 UX45 installation - alignment, SR4, ACS HOMs, LLRF, HW Commissioning.
LHC RF 6th October 06 RUX/UX45 installation - alignment-WGs-Bunkers-Cabling-Networks, ACS, ADT,A0B-LEIR-ADT-H112
LHC RF 20th October 06 RUX/UX45 installation - Cabling, 3rd Bunkers-HOM protection, Couplers, Modules, ADT,Controls, LLRF, conditioning/SM18 single cavity, HWC - Cry & RF co-activity.
LHC RF 27th October 06 RUX/UX45 progress-Cabling-3rd Bunker-HOM protection, Couplers 132,133 131,134, ACSCA LHC 21, ADT, LLRF Dual DDS I&Qplots-setpoint, Electricity Jan07, Biocells
LHC RF 10th November 06 ACS Couplers 131-134, Cavity21, ADT Amplis,MAC,PIMs, UX45-various, LLRF modules & crates, Tools support.
LHC RF 24th November 06 ACS Couplers 131-134, Cavity21, ADT Amplifier completion, UX45-various, LLRF crates, Tools support, ADT racks & SR4 DICs and cabling to organize.
LHC RF 1st December 06 UX45 installation, Couplers 131/4 Cavity21, Module4 SM18 New Conditioning preparation, ADT Russian visit, APW feedthroughs, LLRF series prodn. FSU.
LHC RF 8th December 06 ACS Couplers 131/4, Module4, Cavity21 & new conditioning prep., UX45 status & pics., LLRF status list, Acquiris modules.
LHC RF 22nd December 06 ADT Amplis completion and UX45 supports, UX/RUX45 installation-cabling-water-HV&PCtests, commissioning, 2007 milestones, SR4 enclosure in place. ACS MC 132/133, conditioned-131/134 mounted. Module4 complete, Cavity21 & new conditioning module first test

2005 Meetings

LHC RF 7th January 05 ACS Modules 3,5. ACS Couplers 118-119, ADT review & Dubna visit, Coax cables order, Installation UX45, Cryo rediscussions, LLRF and controls news
LHC RF 14th January 05 ACS Module 3, SM18 Planning 2005, ACS Power, ADT, UX45 Instlln and Planning, Access meeting Jan05, Software program.
LHC RF 4th February 05 CE work in UX45, layout in UX45. ACS Module 5 and tuning. ADT & Dubna work, cabling. Faraday cages, Controls.
LHC RF 11th February 05 Couplers 118-121, ACS Cavity Tuning Status & actions, ADT, LLRF, Beam Dump Interlocks.
LHC RF 18th February 05 Couplers 118-121, Soleil Incident, Modules, ADT, LLRF, UX45, Beam Dump Interlocks.
LHC RF 25th February 05 ACS Couplers, SC Cavity tuning details, ACS Cryo meeting, ADT, LLRF Tuner ctrl & F/B, Acquisition systems. Access system & valves
LHC RF 4th March 05 ACS Couplers, Second SM18 He incident, B867 test area, LLRF Tuner module, ACS Cryo Beam permit interlocks.
LHC RF 11th March 05 ADT Dubna visit, ACS MC116-119, SM18 incident-meeting with Cryo, ACS 5B Tuner Measurements. LLRF Tuner module, UX45, Controls&SR4, Beam Permit for RF.
LHC RF 18th March 05 ADT, SM18 incidents at DSOC, Klystron ripple results, LLRF, Layouts-UX45, Machine Protection.
LHC RF 1st April 05 ACS Module 3, couplers 120/121, ADT supplies & amplis,B867, Klystron ripple, LLRF, Cryo WRL, Diagnostics and SR4.
LHC RF 8th April 05 ADT & MP Review, ACS Couplers 120/121+Modules 3&5,  LLRF, UX45 integration & General Planning April 05
LHC RF 15th April 05 ACS Couplers 120/121+Modules 3&5,  ADT & Dubna, UPS UX45 & SR4, LLRF-Timing, UX45 integration and installation
LHC RF 29th April 05 ACS Couplers 120/12, Modules 2&5, ADT & Dubna, Flexwell cables order; Electrical layouts, racks cabling, UX4 installation
LHC RF 13th May 05 ACS Module 2, Couplers, ADT anode supplies factory tests, Access system logic, APW presentation, HOM cables routing
LHC RF 27th May 05 UX45 Installation, ACS couplers and modules, ADT, LLRF
LHC RF 3rd June 05 UX45 Installation and integration, ACS couplers & modules, ADT & B867 test stand, Software & controls
LHC RF 10th June 05 UX45 Installation and integration, ACS couplers & modules, ADT & B867 test stand, Rack Layouts ACS & status
LHC RF 17th June 05 ADT-Dubna shipment-B867, ACS couplers & Module 2, APW, LLRF Overview, Installation and integration+UX45 Pictures
LHC RF 24th June 05 ACS MC122-125. M2 tests&tuning, B867 ADT ampli&tank, APW&plating UX45 progress, Faraday cages, Access conditions
LHC RF 1st July 05 UX45 CE progress, MC122-125. M2 cond.&LLRF tests, 1st test tuning compens Cav5B, SR4 floor, BDI & radiation meeting.
LHC RF 22nd July 05 ACS, ADT, APW, LLRF, UX45 & CE work, RUX45 access & radiation, cryo wrl.
LHC RF 5th August 05 ACS, B867 APW, UX45 status
LHC RF 12th August 05 ACS  couplers, modules & power, APW, UX45 status, Access system
LHC RF 19th August 05 SM18 - Module 2 bellows incident, Acquistion Systems, ACS Couplers, ADT Review, Flexwell cables, LLRF, Installation UX45
LHC RF 2nd September 05 SM18 - Coupler MC122, ACS Domes module 5, spring comp delataT, ADT kickers planning, Controls Status Present., UX45 Installn & access proposal SC-RP
LHC RF 16th September 05 UX45 installation planning, SM18 planning -Couplers test stand status, ADT, Faraday cages delivered
LHC RF 23rd September 05 SM18- HOM meas. M2 and LLRFtests, APW, ADT, UX45 installation.
LHC RF 30th September 05 Coupler test stand, ACS modules 2, 5 HOM tests contd. Points following SM18 LLRF tests, ADT, UX45 installation, cabling.
LHC RF 7th October 05 UX45 installation status, ACS modules 2&5, ADT, ACS HOM loads
LHC RF 21st October 05 ADT Dubna news JINR collab. ACS Module5 springs result, Module 2D field, ACS klystrons, APW LLRF Controls, UX45 installn.
LHC RF 28th October 05 Round Table:  UX45 (platform), Last Klystron accepted, ACS SM18 + documentation, ADT-Delivery from JINR, APW test, Racks grounding. Annex: ACS couplers, ADT power-amplis-supplies, APW construction.
LHC RF 4th November 05 ACS Modules 5 (springs) & 2. Klystrons - satur. curves. UX45-Platform problems, cabling, initial vacuum planning. ADT, APW LLRF,Software.
LHC RF 11th November 05 SA2 progress MC 126/7, Modules 4&5, ACS power, ADT, APW tests LLRF & diagnostics, UX45 installation - platform, cabling progress
LHC RF 18th November 05 ACS Couplers 124-128, Module4, domes&bellows, ADT first 3 tanks, electrode tests, supports. APW planning&tests. UX45 - platform 'blocked'.
LHC RF 25th November 05 ACS MC124-127, SM18 planning, ADT electrode tests, Anode converter delivery, Klystrons HV box.UX45 platform & wall status
LHC RF 2nd December 05 ACS MC124-127 M4, SM18 planning, ADT 4 Anode conv, Klystrons HV box, APW progress, Controls, UX45 platform & wall, LLRF
LHC RF 9th December 05 UX45 Walls and platform, ACS M4 tuner drive & bellows, APW progress, LLRF VTU and Fibres

2004 Meetings

LHC RF 7th Jan 04 UX45 Final Layout, SM18, ACS Couplers, ADT Collaboration
LHC RF 16th Jan 04 UX45, LHC Access, Couplers, He Valves, ADT, Budget, HOM filters, Klystrons & LLRF, Dust Traps
LHC RF 30th Jan 04 ACS Couplers,SM18, Cryo,ACS Power,UX45, LLRF Electronics
LHC RF 6th Feb 04 ACS Couplers, Power, SM18, Cryo, UX45, Integration & Layout, ADT, EVM
LHC RF13th Feb 04 SM18, Module3,Cryo-Valves & He release, Vacuum layout in RUX45, ADT kickers, Power Amplifier, Supplies
LHC RF 20th Feb 04 ADT, Dust Traps, Module 3, ACS couplers, IR4, Access.
LHC RF 27th Feb 04 Special meeting on Low Level RF for LHC (Philippe Baudrenghien)
LHC RF 5th March 04 ACS & ADT news. Dust traps. Recent discussions-Vacuum,UX45Cooling, Naming. UX45 radiation and plot
LHC RF 12th March 04 SM18 - Planning & organisation of tests, ADT news, General planning & RF installation, Dust traps
LHC RF 19th March 04 ACS Couplers&SM18, Equipment naming, Cryo Meeting, Commissioning and planning, LLRF progress
LHC RF 26th March 04 SA2 klystron & Coupler conditioning options, SM18, Planning, Naming, ADT, PVSS, SM18 responsibilities
LHC RF 2nd April 04 SA2 klystron, SM18, Layout&Planning, ADT, Faraday Cages UX45
LHC RF 16th April 04 SA2 mods for LHC klystron, Flexwell cable & Faraday cage procurement, UX45 CV, LLRF status
LHC RF 23rd April 04 ADT, ACS couplers-SA2-Klystron, ACS & Cryo, Market Surveys
LHC RF 30th April 04 Cost Indexing, Market Surveys, ADT,  Commissioning, SM18, SA2, ACS. Klystron 9, EMC demo with AB-PO
LHC RF 7th May 04 SA2 klystron operational, ACS, ADT, Commissioning, Controls - AB-CO/TC.
LHC RF 14th May 04 LLRF and RF Feedback module, SA2, ACS Couplers, Klystrons, SM18
LHC RF 4th June 04 ACS Couplers, SM18, ADT, SR4 layout
LHC RF 11th June 04 ACS Couplers - conditioning experience in SA2, SM18 Planning, SR4 Control Room final layout
LHC RF 18th June 04 ACS Couplers/Modules/SM18, ADT, Operations Naming, Signal Monitoring, Software Plan
LHC RF 2nd July 04 Installation Planning Overview, Equipment Naming, DiC Conventions
LHC RF 30 July 04 ACS klystrons, couplers, modules. SM18 klystron Test. ADT
LHC RF 6th August 04 ACS module 1 bake-out, ACS Couplers, Progress on layouts & cabling
LHC RF 13th August 04 SM18 Progress, ADT. Cabling, Integration, Commissioning, EVM
LHC RF 20th August 04 SM18 Module 3 coupler incident
LHC RF 27th August 04 SM18 Module 3 coupler incident - follow up, ACS Couplers & Power. Planning latest, EVM
LHC RF 3rd September 04 ADT review, Installation & Planning, ACS Couplers & Module 1, ACS Power.
LHC RF 17th September 04 ACS Couplers, Power & Modules, SR4, Pick-Ups, LLRF
LHC RF 24th September 04 ACS, ADT, Naming
LHC RF 1st October 04 Installation Planning, 867 Test Stand, ADT, ACS, LLRF status
LHC RF 8th October 04 SM18 ACS Module1, Coupler 113, Cables/Faraday cages, ADT & Tunnel layout, LLRF
LHC RF 22nd October 04 UX45 Faraday cages, SM18 ACS Module1, Couplers 113&114, Klystron test in SM18
LHC RF 29th October 04 ACS Module1, Couplers 114&115, UX45 Planning, Coax cables, Klystron ripple measurements
LHC RF 12th November 04 ACS Module5, Couplers 114-117, UX45 and earthing, Coax cables
LHC RF 19th November 04 ADT & B867, Module5, Couplers 114-117, Klystron ripple, Controls
LHC RF 26th November 04 ADT, Cables, Cryo lines, ACS, Klystron ripple compensation, EMC Workshop
LHC RF 3rd December 04 ACS, Cables, UX 45 Installation, Naming, ACS Power Converter ripple
LHC RF 10th December 04 ACS Modules 3,5. ACS Couplers 111-117, ACS power&ripple. Noise specs for ACS, Cables, UX45 cryo lines, LLRF

2003 Meetings

LHC RF 12th Feb 03 EVM organization, review of action list, UX45 layout, radiation&electronics.
LHC RF 19th Feb 03 UX45 Infrastructure, Report of meeting on cooling systems with ST-CV, Radiation UX45
LHC RF 26th Feb 03 UX45 Layout, UX45 layout & Infrastructure, Storage, SM18 upgrade.
LHC RF 12th Mar 03 EVM, UX45 integration
LHC RF 19th Mar 03 EVM, Earthing, Racks, ACS Power Coupler results in SA2
LHC RF 26th Mar 03 Earthing UX45, EVM, Racks + SR4, ADT PC specification
LHC RF 2nd Apr 03 EVM, Report on First IR4 Integration meeting of 26th March, ACN news, Radiation
LHC RF 9th Apr 03 EVM & CtoC, Integr./Infras. IR4 -Cryo, CV, shielding, Cabling & trays, ADT, SM18 upgrade
LHC RF 30th Apr 03 Special meeting on cabling
LHC RF 7th May 03 UX45 Layout status, Review of vacuum controls
LHC RF 14th May 03 Installation of ACS modules, access to equipment, HOMC loads in LEP, proposals for LHC.
LHC RF 21st May 03 Follow-up ACS installation, access, HOMC Loads
LHC RF 28th May 03 Vacuum equipment & layout, Vacuum controls, ACN Cavity 8
LHC RF 4th June 03 HOMC loads, Klystron cooling, Radiation, LLRF
LHC RF 11th June 03 Proposal for ACS HOMC Connections, klystron delivery, EVM 'stability', ADT news, LLRF
LHC RF 18th June 03 EVM, Power Coupler planning, VME Crates.
LHC RF 25th June 03 Power Couplers, HOMC cable loads - agreed layout, CE in UX45.
LHC RF 9th July 03 ACS Power Coupler progress, SM18 & module cycling, ADT status and news, UX45 radiation prelim results, Warm recovery line, LLRF Planning, UX45 integration outstanding items.
LHC RF 30th July 03 ADT update, P4 Integration, RF devices
LHC RF 13th Aug 03 Couplers, SM18 Power, Modules, Integration
LHC RF 27th Aug 03 SM18, ADT, Integration.
LHC RF 10th Sept 03 SM18 power tests, ACS Module3 status, ADT- Converters, feedthroughs, amplis, cooling, Radiation in IR4 Soleil
LHC RF 24th Sept 03 SM18, ACS - Module3, 2nd set Power Couplers, P4 Integration Review, RF devices (2), Software.
LHC RF 8th Oct 03 ADT Review, P4 Integration, SM18 2nd Bunker.
LHC RF 15th Oct 03 ACS Module 3 status, ACN cavities, LEP equipment in ISR, Cryo controls, Software, LLRF, UX45
LHC RF 22nd Oct 03 ACS Module 3, ACS Power Couplers, ADT, P4 Integration,
LHC RF 29th Oct 03 ACS Module 3, ADT news-kickers, power converters, Tunnel Integration, Front-end Software
LHC RF 5th Nov 03 ACS Module 3 - status and frequency measurements, Tunnel Integration review, ACS Warm Recovery Line
LHC RF 12th Nov 03 ACS Module 3, RUX45 Integration follow up, Report on LHC Integration Day
LHC RF 20th Nov 03 ACS Module 3, RUX45 Integration, Presentations and Points from AB-LTC review
LHC RF 26th Nov 03 Vacuum/Radiation in UX45, Integrarion, ACS module 3 (full power applied to 3/4 couplers)
LHC RF 3rd Dec 03 Report on expected vacuum in IR4, Progress ACS Module 3, Integration UX45-LLRF racks siting
LHC RF 10th Dec 03 Status of ACS module 3 (Full power on all couplers-7MV/m in cavity C), Radiation & LLRF racks positioning.
LHC RF 17th Dec 03 Postioning of LLRF racks in UX45

2002 Meetings

ACS meeting 4th Sept 02  
ACS meeting 13th Sept 02  
ACS meeting 20th Sept 02  
ACS meeting 27th Sept 02  
ACS meeting 8th Oct 02  

Special Meetings

Cryo 20th Oct 01 ACS cryo issues
Cryo 26th Sept 01 ACS cryo issues
Cryo 23rd Nov 01 ACS cryo issues
Cryo Scenarios 26th Nov 01 Cryo parameters
Cryo 10th June 02 RF installation cryo side UX45
Cryo 8th July 03 Rigid cryo line
Meeting on Cryo and safety issues for ACS 12th March 04 He valves and safety, Operation & Commissioning, Controls, Planning.
Follow up Cryo issues and He circuits 21st April 04 Quench valves and connections, protection valves, WRL
Cryo-Requirements & Options 4th January 05 Summary of requirements & He supply options review - Pre LHC Perf W/shop - by AT-CR
Reply input on Cryo requirements and Options Feedback and additions to above
Cryogenics Distribution for 400 MHz RF system - 18th Feb 2005 Follow up of proposals from Chamonix 2005 presentation - S. Claudet
SM18 Program Oct 2007 Plans for sM18 operation & priorities, 2007 early 2008, with S. Claudet
   
Cooling Water Systems 11th October 02 UX45, Chilled water requirements, Maintenance in test stands
   
Access in UX45 9th Jan 02  
Access in RUX45 15th Jan 04 With OP, BDI, RF and VAC groups
Reply to issues raised RUX45 Access Meeting 18th Feb 04  
Summary of meeting on RUX45 access 11th Jan 05 Handling of 'RF Enable' mode. Access interlock handling
   
   
Grounding P4 3rd March 03  
   
   
P4 Vacuum 7th August 2003  
ADT Vacuum 16th Feb 2004  
IR4 Vacuum 23rd Feb 2004 With M. Jimenez

 

 

 

 

 